法邦网—法律法规查看

APPENDIX NUMBER NAT-I-845-3-2 BETWEEN THE AMERCIAN INSTITUTE IN TAIWAN AND THE COORDINATION COUNCIL FOR NORTH AMERICAN AFFAIRS (AD.1986.10.1)


【颁发部门】

【发文字号】

【颁发时间】 1970-08-19

【实施时间】

【效力属性】


1 This Appendix identifies specific serrices to be provided by AITfor the CCNAA, in accordance with Annex III to NAT--I--845. ARTICLE I --Description of Services The AIT will provide specialists, identified in Attachment 1 to this Appendix, with backgrounds in performing microwave landing system (MLS) site surveys, defining MLS eqilipment and flight c-heck equipment, and developing MLS approach procedures, to trav-el to Taiwan on a temporary duty (TDY) basis. The specialists will prepare a report for CCNAA which will cont-ain sufficient information to prepare an MLS procurement docume-nt for Taitung / Fengnin and Hualien/ Hualien aerodromes. The T-DY will be divided into four phases which are detailed in Attac-hment 1 to this Appendix. ARTICLE II --Manpower Requirements and Cost Estimates A The estimated total cost for the AIT technical assistancs isU.S. $52,700.00, which includes salary and benefits, transpor-tation, per diem, AIT/ Washington support and 12 percent admi-nistrative overhead charge. B Should additional services be required, the date and length ofsuch service will be by mutual consent between AIT and CCNAA, and related cost estimates will be documented in an amendment to this appendix or in a separate appendix. ARTICLE III Financial Provisions A CCNAA agrees to reimburse AIT for actual costs incurred by AITin providing services under this agreement plus a 12 percent administrative overhead charge. The estimated cost also inclu-des 10 percent as contingency to cover unexpected costs. B AIT will render financial statements to CCNAA. AIT bills will : 1 Contain a referenceto the Appendix number assigned to this project (NA-T--I--845--3--2) ; 2 Identify charges accrued at the time of billing and periods covered ; and 3 Be forwarded for payment in accordance with Article III to the basic agreement (NAT--I-845). C Payment of bills is due within not more than 60 days from the date of billing. Payment is to be rendered by check payable inU.S. dollars and forwarded to AIT at the following address : American Institute in Taiwan 1700 North Moore street Suite 1705 Arlington, Virginia 22209. ARTICLE IV--Effective Date, Duration and Termination This agreement is effective upon signature by duly authorized r-epresentatives of AIT and CCNAA and will terminate upon complet-ion of services specified in this agreement and CCNAA paymentsto AIT covering the financial arrangement stated herein. ARTICLE V--Approval If this agreement meets with CCNAA's approval, a duly authorizedrepresentative of CCNkA is requested to sign the agreement as i-ndicated below. When the agreement is signed by both duly autho-rized representatives of CCNAA and AIT such agreement will cons-titute a reimbursable agreement between CCNAA and AIT for the s-ervices delineated in the agreement. The American Institute in Taiwan By: [Signed] Title: Corporate Secretary Date: Sept. 2, 1986 The Coordination Council for North American Affairs By: [Signed] Title: Deputy Representative Date: Oct. 1, 1986 ATTACHMENT NUMBER 1 TO NAT--I--845--3--2 Cost Estimates and Schedules for MLS Siting Survey Project Taitung / Fengnin Aerodrome R/ W 04 and Hualien/Hualien Aerodrome R/W 21 Phase One--Project Initiation (to be conducted in Taiwan) 1 Provide CCNAA with information requirements for the project.2 Initial visit by an AIT specialist within 30 days after the p-roject is approved. 3 One AIT specialist will visit Taiwan to obtain information forinitial and final planning objectives and to establish contactwith appropriate counterparts. 4 Phase One Costs -- Eight (8) man / days ; cost estimate is U.S. $9,483.00. Phase Two--Preliminary Feasibility Assessment (to be conductedin the United States) 1 Two specialists (electrical engineering and flight procedures)to assess initial feasibility of siting projects in context ofTaiwan's objectives and identification of objectives for siti-ng project and finalization of project plans and schedule. 2 Phase Two Costs - Twelve (12) man / days ; cost estimate is U.S. $7, 742.00. Phase Three--Siting Analysis and Approach Procedures (to be con-ducted in Taiwan) 1 To provide CCWAA with information regarding planning siting p-roject and approach procedures. A two man team (electrical en-gineer and flight procedures specialist) is scheduled to visitTaiwan during the period September 15 -- October 15, 1986. Ci-vil engineering support on site is to be provided by CCNAA. A-dditional specialists may be required if identified during Ph-ase Two. 2 Phase Three Costs -- Twenty -- two (22) man/ days ; cost esti-mate is U.S. $13,222.00. Phase Four--Report Writing and Approach Procedures Recommendati-on (to be conducted in the United States) 1 Phase Four Costs - Forty- five (45) man / days ; cost estimateis U.S. $12,249.00. The estimated total cost Phase One through Phase Four is U.S. $52,700.00.

相关阅读

回到顶部